BFH Installation & Maintanance - page 4

pg. 4
INSTALLATION USING THE INTERLOCKING FLOORING
When installing our interlocking floating floor system follow the same pre installation preparations you would if you
were going to hail or glue down the product. In addition a 3 in 1 foam or for sound should be applied between the
interlocking flooring and the subfloor. At minimum. it is recommended that the installer float our interlocking products
over 6mm polyethylene sheeting to protect the floor from any
elements that may be in the subfloor such as moisture. When applying the sheeting it is necessary
sheeting by a minimum of 4" and be sure to tape them for proper protection. Many of the flooring recommended 3 in 1
foams will include seam tape for proper installation and foam for ample sound dampening. Refer to 3 in 1 foam
installation instructions for additional subfloor and installation requirements specific to that product. It is important to
remember acceptable subfloor moisture levels still apply and proper acclimation is a necessity with interlocking
bamboo flooring. (see above for details)
FINISHING SUGGESTIONS (UNFINISHED FLOORING)
There is a variety of water based durable polyurethane finishes to choose from. Apply one sealer coat for proper
adhesion followed by 1 or 2 top coats for maximum durability. Using a water
during installation. Two such water based polyurethane products are Basic Coatings by Street Shoe and Easy Street
or Bona Kemi Traffic.
MAINTENANCE
Proper maintenance procedures play an important role in the upkeep of all floors. A maintained floor increases the
lasting beauty of your floor and makes for a satisfied customer. For stubborn spots, use a urethane floor cleaner,
ammonia and water or a citrus-based floor cleaner (use any liquid cleaner sparingly and do not apply the cleaner
directly on the floor).
It is also recommended not to put down area rugs or throw rugs for approximately one
month after installation to prevent inconsistent coloration
Every floor, including bamboo, must be swept with a soft bristle broom (the Swifter is highly recommended and
effective) daily or as often as necessary and/or mopped (slightly damp) if necessary. Walking on gritty, d
the fastest way to wear the urethane finish.
Exterior entrance mats should be used to capture most of the harmful dirt. Zep hardwood and laminate flooring
cleaner is great for bamboo floors.
Tips for a Successful Installation
Read all instructions first: Get all your questions answered before you start installing the floor. Before installing let the
flooring sit in the room for 7 to 10 days to acclimate to temperature and
moisture. Run air conditioning or heat as you would for normal liv
Be aware of moisture problems: Moisture can ruin any floor. Always look out for potential moisture problems,
especially in basements. Testing the subfloor for moisture is a necessity.
Check for moisture: Tape a 2’ X 2’ section of clear pl
discoloration or condensation appears on the underside of the plastic after 24 hours, there is moisture coming from
the floor.
Dealing with moisture before installation: If you have or suspect mois
Contact a professional flooring installer to improve the sub
It is highly recommended that the installer lay out all the flooring before installation in order to visual
product for any abnormal color variances.
Room / entryway preparation: Undercut door casings are much better than trying to scribe the flooring to fit there.
Always leave ample expansion area: Leave 1/2” space at each wall for expansion of
this gap. Leave an additional 1/16” for every 10’ for rooms exceeding 25’ and larger.
T moldings recommended for doorways to allow for expansion and movement of flooring between rooms.
Tapping block: You can use a trimmed piece of flooring for this, or buy a pre
FLOORING DIRECTLY AND BE CAREFUL NOT TO FRACTURE FLOOR EDGES.
Ph: (808)
-based polyurethane will minimize odor
due to inconsistent lighting exposure.
ing conditions.
astic sheeting to sub-floor, forming an airtight seal. If
ture problems, don’t install your floor yet.
-floor to an acceptable level of moisture.
wood. Base moldings will cover
-made tapping block. NEVER HIT
Bamboo Flooring Hawaii
521 Ala Moana Blvd Suite 213
Honolulu, HI 96813
550-8080 Email:
.
com
to overlap the
irty floors is
ly inspect the
1,2,3 5,6,7,8,9,10
Powered by FlippingBook